Welcome to my Blog! I built the Wilshire Mk III with Henley Properties Group in 2009. All the trial and tribulations of my journey are here, along with my ongoing ideas and inspiration for decorating, with a little bit of DIY and crafting thrown in for good measure!
15/10/09 Internet fixed (4 weeks without it), no thanks to the phone company...
07/10/09 'Phone Company' *finally* discovers phone line issue and connects us up (3 weeks late)
26/09/09 TV arial and phone line in kitchen fit off.
25/09/09 Heating and cooling commissioned and new fridge delivered. FIRST NIGHT IN!!
24/09/09 Appliances installed (ovens, cooktop, dishwasher and hot water).
21/09/09 Hire truck to clear out storage (2 exhausting days!)
17/09/09 Carpet installed (2 days).
15/09/09 Timber flooring installed (2 days)
14/09/09 Telstra trenching.
10/09/09 Bank cheque and HANDOVER!!
04/09/09 re-inspection of fixed items, Certificate of Occupancy received. 4 outstanding items to be fixed.
27/08/09 NEW HOME INSPECTION ( a.k.a PCI). 66 defects on the list.
26/08/09 Linea band to portico rendered (finally!)
19/08/09 Handover department carried out their inspections with yellow stickers everywhere!
17/08/09 CONSTRUCTION COMPLETE!! Top coat of render applied, site cleaned, rubbish cage and port-a-loo removed.
13/08/09 Flyscreens installed, window scratches touched up and washed, sewerage connected (I think!)
12/08/09 Portico gutter and fascia fixed.
11/08/09 Painter back to touch up red dots!
07/08/09 Termite barrier installed, door weather seals, gas meter installed, water mains buried, mirrors and shower screens, cleaners on site, proper pot drawers installed.
05/08/09 Kitchen and laundry taps and sinks, toilets, door handles and locks, stormwater connected, power points, TV points, light switches, all external junction boxes and red dots everywhere!
04/08/09 Plumber on site.
03/08/09 Chippies and sparkies on site, rangehood installed.
31/07/09 Front elevation linea bands rendered and painted.
27/07/09 Garage door installed.
24/07/09 Tiling completed (apparantly!)
20/07/09 Wet area tiling begins. All bathroom flooring done!
17/07/09 Alarm points, cooling and heating control and duct covers installed. Shelving to wardrobes and linen cupboards installed. Tiles delivered.
16/07/09 Downpipes installed, but not connected.
15/07/08 Internal painting 'appears to be' finished, downpipes delivered!
06/07/09 - 11/07/09 Fix garage roof tiles and guttering, install garage ceiling, external paint complete, internal paint begins, alfresco ceiling completed. Fence extension installed. Caesar Stone benches installed.
29/06/09 - 03/07/09 First coat of render and painting begins.
25/06/09 Fixing stage complete.
15/06/09 Kitchen installed!!
11/06/09 Stairs installed and fixing begins.
10/06/09 Garage roof tiles installed.
02/06/09 Plastering begins. Both floors done in a day!
This blog is only intended to tell our story to family, friends and any others whom may be interested in reading. Individual names will not be used on this blog, and our personal information will not be posted. Company names are used with the intent of telling our story. If a company named on this blog believes that statements have been made of an abusive, obscene, vulgar, slanderous, hateful, threatening, or defamatory nature please contact us to allow the item in question to be edited or removed from the blog.