We can all dream a little, can't we?
I was looking through Real Estate sites (as I often do!) and came across this little gem in Sagaponack in 'The Hamptons'. So much potential, so much space....and so much cleaning!
Newly built on 7 1/2 acres with a pool house, carriage house and restored 250 year old barn! Also a pool, tennis court and spa. The 'main' house has 8 bedrooms, a theatre, gym with sauna, 11 toilets, a wine 'room' and a lift, all spanning 3 levels!
Just look at it's beautiful huge entrance. Imagine the possibilities here!
Huge living room with marble fire place, built in shelves and beautiful ceilings:
Separate library:
Kitchen, which I would change quite a bit in:
Second staircase and mud room:
Main staircase landing:
Marble master bathroom with fireplace:
The Wine Room:
Full plans, pictures and other info all HERE.
What would I change? The lights and hardware in the kitchen, and possibly the splashback tiles, and have the island bench top match the others. I would probably also like to see some internal french doors, or just transoms to define different rooms where there are no doors. Also noted there are no transoms above the exterior windows and french doors. I would probably also change the mirror lights in the bathrooms and add chandeliers everywhere! Nice to dream a little!
How would you furnish it, and what would you change?
All images here.
Thursday, September 23, 2010
Saturday, September 18, 2010
And The Winner Is.......
Congratulations April from A City Girl Stuck In Rural Oz. You are the winner of my first giveaway, and will be the owner of a six butterfly frame of your choice.
Congratulations!!! I will email you shortly!
Congratulations!!! I will email you shortly!
Friday, September 10, 2010
Happy Anniversary!
Hard to believe it's a year today since we got the keys to our house!
Outside, not much has changed at all...except the weeds! Inside there have been lots of changes, but still soo much to do. These school holidays I plan to clean out the kids wardrobes (again...) and also all their toys upstairs and get that a little more organised. A garage sale is sure to follow at some stage!
Now I have lived here for 12 months, what would I change?
Not a lot, really!
*I'd move a couple of power points so they weren't behind big pieces of furniture
* we perhaps could have extended the garage a bit to give us more storage space but less room down the side for garden
* move the 2 way light switch for the stairs to the stair wall not on the dining wall
* added another downlight in the family room
* not got the standard 'builders' dishwasher (it's basically crap!)
* installed a small openable window in the laundry for the dryer (which now lives in the garage with better ventilation)
* possibly an extra 3 pot drawers instead of a double cupboard on the island bench
* more power points behind the TV in the family room
* applied for special dispensation to get the house moved forward the 1 metre it had to be pushed back for the double storey portico (a bit more room in the backyard could have come in handy)
* different taps (yep, I still don't like them)
I still love all my colour choices, adore my bricks, love the facade (goes well with all the older 1960's houses in the street!), love the layout (but could do with a bit more furniture!) and love the space!
Don't forget to enter my giveaway competition, for your chance to win one of my butterfly frames. Just leave a comment on my giveaway post HERE to be in the running. Entries close 8pm EST Friday 17th September 2010.
Outside, not much has changed at all...except the weeds! Inside there have been lots of changes, but still soo much to do. These school holidays I plan to clean out the kids wardrobes (again...) and also all their toys upstairs and get that a little more organised. A garage sale is sure to follow at some stage!
Now I have lived here for 12 months, what would I change?
Not a lot, really!
*I'd move a couple of power points so they weren't behind big pieces of furniture
* we perhaps could have extended the garage a bit to give us more storage space but less room down the side for garden
* move the 2 way light switch for the stairs to the stair wall not on the dining wall
* added another downlight in the family room
* not got the standard 'builders' dishwasher (it's basically crap!)
* installed a small openable window in the laundry for the dryer (which now lives in the garage with better ventilation)
* possibly an extra 3 pot drawers instead of a double cupboard on the island bench
* more power points behind the TV in the family room
* applied for special dispensation to get the house moved forward the 1 metre it had to be pushed back for the double storey portico (a bit more room in the backyard could have come in handy)
* different taps (yep, I still don't like them)
I still love all my colour choices, adore my bricks, love the facade (goes well with all the older 1960's houses in the street!), love the layout (but could do with a bit more furniture!) and love the space!
Don't forget to enter my giveaway competition, for your chance to win one of my butterfly frames. Just leave a comment on my giveaway post HERE to be in the running. Entries close 8pm EST Friday 17th September 2010.
Wednesday, September 8, 2010
GIVEAWAY!
To celebrate 'almost' 1 year since getting the keys to our home, and 'almost' 200 posts (they won't quite line up at the same time!) I am going to be giving away one '6 butterfly' frame of your choice. Have a look through THIS POST HERE at all the ones I have created to give you an idea of what I can create for you. Leave a comment on this 'Giveaway' post telling me a little about yourself, and what butterfly frame you would love to see in your home to be eligible to enter.
You must be an Australian resident to enter and only leave 1 comment. Spam comments will not be included! The competition will close on Friday 17th September at 8pm (Eastern Standard Time), and be drawn sometime that evening.
Good Luck!!!
You must be an Australian resident to enter and only leave 1 comment. Spam comments will not be included! The competition will close on Friday 17th September at 8pm (Eastern Standard Time), and be drawn sometime that evening.
Good Luck!!!
Tuesday, September 7, 2010
12 Month Maintenance Inspection.
Monday last week saw our 12 month Maintenance Inspection. I can't believe nearly 12 months is up! Where has the time gone??
I had been keeping a list of items I wanted attended too. There was nothing terribly serious, mostly just the odd crack and nail pop here and there that comes with a settling house. I am happy to report that 'most' things on the list will be attended to. Here are some of them:
* Touch up crack above garage and internal access door:
* Sand rust off external door jambs to garage external door, prime and repaint (no photo)
* Downpipe above rear garage door needs sealing as it leaks, and has done all over the w brickwork and caused moss to grow on the mortar. Bricks will be cleaned and a sealer put on to prevent them going green again IF it happens again.
* Fix quad at rear eave under alfresco:
*Stain seal the eaves beside the meals area and repaint. This is where the eaves were wet from the inside when the the roof scaff had been on but the tiles were not replaced, and it rained...right onto the eaves. The first image I took back in July last year before they had been painted and clearly shows the wet patch:
...and this one today with a nice big water stain showing through the paint work:
* Repair nail pop and cornice (not shown) in lounge:
* Touch up kitchen/hall doors along lounge wall (few cracks - no pics).
* Repair nail pops in ceiling above kitchen sink. There is a whole line of them - no pics as they didn't show up terribly well!
* Refit and touch up centre moulding in stairwell (that's the thin flexible wooden moulding around the wall in the first pic):
...it's cracked and come away from the wall in several places (added contrast makes it look loads worse than what it actually is):
* Touch up stair landing:
* Refit skirting in Bedroom 3:
* Refit skirting in Bathroom (funnily enough it's on the other side of the wall to the bedroom 3 skirting):
* Repair flexi pointing (coloured mortar) to roof in several places, and inspect upper storey as well (it looks like a 30 year old roof, not 12 months old...HUGE disappointment):
* Replace window beading in bathroom (this split very early on and I have been scared to touch it!):
* Supply cold water tap to bathroom (we have to install). The 'pin' on the tap (which I hate anyway...long story) is the wrong one for that tap. It's too short, and I cannot turn it to make it sit into the tap as it's too short. The gap has always been evident and doesn't look like any of the other taps:
* Seal around tap washers in shower (I wasn't aware there was a problem!)
* Repair cornice above bedroom 4 door in TV area (added contrast to make it more obvious....my walls are not that colour!!):
* Replace lever door handle on front door (it's corroded and looks terrible. Hopefully the replacement won't do the same):
* Electrician to inspect cut HDMI cable. This is the one item left over from handover which (12 months later) still has not been attended to. It's the $200 cable from the family room to the alfresco which was cut by the fit off electricians prior to handover, when it was installed by our own Network cable guy. It had nothing to do with Henley and they should never have touched it. It's useless and needs replacing.
The one thing they may not attend to (which funnily enough was the first thing on my list back last September after we moved in) is the paint work on the front door. I signed a 'dark paintwork disclaimer' as the doors are black, so they would not warranty the doors against warping. Strictly speaking they haven't warped at all, and either the paintwork is crap or the doors are faulty. As I have panel doors, not flush doors, the panel moves under the paint, and the paint has cracked, so you can see the lovely blue door underneath. It looks terrible and I'd love them to be replaced, but I may not get my wish because they are black. I noticed this the day after we got the keys, and I 'should' have called them straight away, especially due to the 'dark disclaimer' on the doors. But, because handover time is such a busy time, I didn't. I also don't have dated photographic evidence, as I had to content with school holidays, birthdays, a weekend away and all the dramas with moving in all within a month. It was forgotten quickly...
Fingers crossed 'something' is done about it...
I also had drainage on the list, and squeaky doors, but because we haven't landscaped yet, it obviously a soil issue (thick clay in places). The squeaky doors can be fixed with graphite powder and we will have to do ourselves. I also had the splashback in the kitchen on the list. Quite often I get 'runs' down it from the silicone underneath the upper cupboards down the splashback. The inspector tried to put it down to condensation, but it doesn't happen so much under the rangehood where most of the condensation is, and it's an oily run, not water. He has never seen it before and couldn't explain it....neither can I! But it does have something to do with the silicone, as every so often it looks shiny and runs! I am not in the habit of cooking endless amounts of oily fried food too, that 'may' cause this....and I tend to keep the splashback clean and free from cooking residue.
Strange, and has me completely stumped!
So that was pretty much it. The bathroom window will be fixed this Thursday, and I recieved a call from Henley to organise a time for the week after next to fix some other issues. Fiingers crossed they are all done properly!
I had been keeping a list of items I wanted attended too. There was nothing terribly serious, mostly just the odd crack and nail pop here and there that comes with a settling house. I am happy to report that 'most' things on the list will be attended to. Here are some of them:
* Touch up crack above garage and internal access door:
* Sand rust off external door jambs to garage external door, prime and repaint (no photo)
* Downpipe above rear garage door needs sealing as it leaks, and has done all over the w brickwork and caused moss to grow on the mortar. Bricks will be cleaned and a sealer put on to prevent them going green again IF it happens again.
* Fix quad at rear eave under alfresco:
*Stain seal the eaves beside the meals area and repaint. This is where the eaves were wet from the inside when the the roof scaff had been on but the tiles were not replaced, and it rained...right onto the eaves. The first image I took back in July last year before they had been painted and clearly shows the wet patch:
...and this one today with a nice big water stain showing through the paint work:
* Repair nail pop and cornice (not shown) in lounge:
* Touch up kitchen/hall doors along lounge wall (few cracks - no pics).
* Repair nail pops in ceiling above kitchen sink. There is a whole line of them - no pics as they didn't show up terribly well!
* Refit and touch up centre moulding in stairwell (that's the thin flexible wooden moulding around the wall in the first pic):
...it's cracked and come away from the wall in several places (added contrast makes it look loads worse than what it actually is):
* Touch up stair landing:
* Refit skirting in Bedroom 3:
* Refit skirting in Bathroom (funnily enough it's on the other side of the wall to the bedroom 3 skirting):
* Repair flexi pointing (coloured mortar) to roof in several places, and inspect upper storey as well (it looks like a 30 year old roof, not 12 months old...HUGE disappointment):
* Replace window beading in bathroom (this split very early on and I have been scared to touch it!):
* Supply cold water tap to bathroom (we have to install). The 'pin' on the tap (which I hate anyway...long story) is the wrong one for that tap. It's too short, and I cannot turn it to make it sit into the tap as it's too short. The gap has always been evident and doesn't look like any of the other taps:
* Seal around tap washers in shower (I wasn't aware there was a problem!)
* Repair cornice above bedroom 4 door in TV area (added contrast to make it more obvious....my walls are not that colour!!):
* Replace lever door handle on front door (it's corroded and looks terrible. Hopefully the replacement won't do the same):
* Electrician to inspect cut HDMI cable. This is the one item left over from handover which (12 months later) still has not been attended to. It's the $200 cable from the family room to the alfresco which was cut by the fit off electricians prior to handover, when it was installed by our own Network cable guy. It had nothing to do with Henley and they should never have touched it. It's useless and needs replacing.
The one thing they may not attend to (which funnily enough was the first thing on my list back last September after we moved in) is the paint work on the front door. I signed a 'dark paintwork disclaimer' as the doors are black, so they would not warranty the doors against warping. Strictly speaking they haven't warped at all, and either the paintwork is crap or the doors are faulty. As I have panel doors, not flush doors, the panel moves under the paint, and the paint has cracked, so you can see the lovely blue door underneath. It looks terrible and I'd love them to be replaced, but I may not get my wish because they are black. I noticed this the day after we got the keys, and I 'should' have called them straight away, especially due to the 'dark disclaimer' on the doors. But, because handover time is such a busy time, I didn't. I also don't have dated photographic evidence, as I had to content with school holidays, birthdays, a weekend away and all the dramas with moving in all within a month. It was forgotten quickly...
Fingers crossed 'something' is done about it...
I also had drainage on the list, and squeaky doors, but because we haven't landscaped yet, it obviously a soil issue (thick clay in places). The squeaky doors can be fixed with graphite powder and we will have to do ourselves. I also had the splashback in the kitchen on the list. Quite often I get 'runs' down it from the silicone underneath the upper cupboards down the splashback. The inspector tried to put it down to condensation, but it doesn't happen so much under the rangehood where most of the condensation is, and it's an oily run, not water. He has never seen it before and couldn't explain it....neither can I! But it does have something to do with the silicone, as every so often it looks shiny and runs! I am not in the habit of cooking endless amounts of oily fried food too, that 'may' cause this....and I tend to keep the splashback clean and free from cooking residue.
Strange, and has me completely stumped!
So that was pretty much it. The bathroom window will be fixed this Thursday, and I recieved a call from Henley to organise a time for the week after next to fix some other issues. Fiingers crossed they are all done properly!
Subscribe to:
Posts (Atom)